Project Name:         Energy Cost:

Building Operating Schedule:

Weekday Hours Open: Weeks/Year: Weekday Hours/Year:  - 
Weekend Hours Open: Weekends/Year: Weekend Hours/Year:  - 
Total Hours Per Year  - 

Space Name:
Room Type:          Room Area (Sq. Ft)          No. of Similar Rooms:
Existing Fixture #1: Lamp Type: Ballast Type: Lamp Wattage: Lamps per Fixture: No. of Fixtures: Total Watts:
 - 
Proposed Fixture #1: Lamp Type: Ballast Type: Lamp Wattage: Lamps per Fixtures: No. of Fixtures: Total Watts:
 - 
Existing Fixture Type 2: Lamp Type: Ballast Type: Lamp Wattage: Lamps per Fixtures: No. of Fixtures: Total Watts:
 - 
Proposed Fixture Type 2: Lamp Type: Ballast Type: Lamp Wattage: Lamps per Fixtures: No. of Fixtures: Total Watts:
 - 
Existing Fixture Type 3: Lamp Type: Ballast Type: Lamp Wattage: Lamps per Fixtures: No. of Fixtures: Total Watts:
 - 
Proposed Fixture Type 3: Lamp Type: Ballast Type: Lamp Wattage: Lamps per Fixtures: No. of Fixtures: Total Watts:
 - 

Proposed Lighting Control Strategy:

Project Cost

Occupancy Sensor $
LCM-1 Occupancy Sensor and an On/Off Wall Switch $
LCM-2 Occupancy Sensor and Bi-Level Switching $
LCM-3 Occupancy Sensor and Bi-Level Switching, Auto ON 50% $
LCM-4 Occupancy Sensor and Bi-Level Switching, Auto ON 50% with Daylighting $
Lighting Retrofit Cost $

Quick Assessment Cost Analysis: Energy Savings with Control Strategy: Estimated Usage
Current Energy Use:  -  kWh/yr
Proposed Lighting System Energy Usage  -  kWh/yr
Energy Savings with Control Strategy:
Occupancy Sensor:  -  kWh/yr  -  kWh/yr
LCM-1:  -  kWh/yr  -  kWh/yr
LCM-2:  -  kWh/yr  -  kWh/yr
LCM-3:  -  kWh/yr  -  kWh/yr
LCM-4:  -  kWh/yr  -  kWh/yr
 

Quick Assessment Summary:

Annual Operating Cost Comparison Energy Savings/Yr Proposed Energy Cost/Yr Simple Payback(Yrs) Energy Cost/Sq. Ft.
Lighting Retrofit: $ -  $ -   -  $ - 
Occupancy Sensor: $ -  $ -   -  $ - 
LCM-1: $ -  $ -   -  $ - 
LCM-2: $ -  $ -   -  $ - 
LCM-3: $ -  $ -   -  $ - 
LCM-4: $ -  $ -   -  $ -